International Humanitarian Infrastructure Platform
  • What is IHIP about?
    • Which problem is IHIP addressing?
    • Context and analysis
    • Expected results
  • Publications
    • Harmonized Conditions Of Particular Application for Humanitarian Construction Works
    • Harmonized Conditions Of Particular Application for Shelter Construction Works
    • Harmonized particular conditions of contract for construction for the WASH sector
    • QUALIFICATION MECHANISM to IHIP COPA
    • Capacity building
    • IHIP user support
  • The IHIP association
    • IHIP Statutes
    • Membership
    • History / Genesis
  • Call to Action
  • Contact form
  • Search
  • Menu Menu
  • LinkedIn

IHIP/ ICRC / UN-HCR satellite session at the GWC satellite event is confirmed on 29th April at 16h

13 April 2021/15,460 Comments/ Non classé /szerzõ: IHIP

April 29 @ 16 h 00 min – 17 h 00 min

 Free

Presenters: Monica Ramos (GWC) / Pavlos Tamvakis (ICRC) / Emmett Kearney (UN HCR)/ François Baillon (IHIP)

This presentation will walk you through the current work being done by the WASH CONTRACT COMMITTEE of the International Humanitarian Infrastructure Platform (IHIP) around construction contracts and how it can de-risk your project. In coordination with the Water and Habitat department of the ICRC and the WASH Unit of the UN-HCR, we will show how this initiative also fits in the WASH sector roadmap to engage better with the private sector (Initiative 3.2).

About IHIP :
The IHIP initiative is mainly driven by operational challenges to improve how humanitarian actors engage with the private sector to deliver infrastructure projects. Its specific function is to build on existing private sector tools and adapt them to the humanitarian context and therefore allowing successful design and delivery of infrastructure. IHIP addresses this issue building on a common reference, the FIDIC construction contract, which is already widely known and accepted by both the private sector and the development and humanitarian actors.

Objective

The objective are:

1. To introduce Initiative 3.2 of the Wash sector
2. To introduce the IHIP initiative
3. To promote the use of the harmonized particular conditions of contract for construction for the WASH sector.
4. To engage with Global WASH Cluster members through pilot project(s) using the harmonized particular conditions of contract for construction developed by IHIP for the WASH sector

Content

• Welcoming remarks , Monica Ramos (5 mn)
• Short introduction about initiative 3.2, Emmett Kearney (5 minutes)
• Concrete examples of challenges, Pavlos Tamvakis (5-10 minutes)
• Presentation of the IHIP initiative, François Baillon (10mn)
• Presentation of the 18 improvement points addressed in the harmonized particular conditions of contract for construction for the WASH sector, François Baillon (10mn)
• Discussion on elements that would help the sector to engage with the IHIP harmonized contract (20 minutes)
• Propose online registration form for interested organizations

Link to the event website

Participation link on TEAMS

Pages

  • Auto test
  • Call to Action for early adopters
  • Capacity building / Ressources / Guides
  • Contact form
  • Context and analysis
  • Expected results
  • Get the Harmonized Conditions Of Particular Application to FIDIC SHORT FORM of Contract for Humanitarian Construction Works
  • Get the Harmonized Conditions Of Particular Application to FIDIC SHORT FORM of Contract for Shelter Construction Works
  • Get the Harmonized Particular Conditions of Contract for Construction for the WASH sector
  • Harmonized Conditions Of Particular Application for Humanitarian Construction Works
  • Harmonized Conditions Of Particular Application for Shelter Construction Works
  • Harmonized particular conditions of contract for construction for the WASH sector
  • History / Genesis
  • Home
  • How to use the IHIP Harmonized Particular Conditions of Contract for the WASH humanitarian sector?
  • How to use the IHIP Harmonized Conditions Of Particular Application for Shelter Construction Works
  • How to use the IHIP Harmonized Conditions Of Particular Application for Humanitarian Construction Works
  • IHIP Call to Action with ZOA & DCHI
  • IHIP Data Privacy policy
  • IHIP Statutes
  • IHIP user support
  • IHIP WEBINAR:18 Improvements in the new harmonized particular conditions of contract for construction for the WASH sector
  • Membership
  • Project Information
  • Project Signup Section
  • Publications
  • Qualification for the harmonized particular conditions of contract – Principles
  • QUALIFICATION MECHANISM to IHIP COPA
  • QUALIFICATION TEST
  • Qualification test 1st attempt (FREE)
  • Qualification test 2-5 attempt
  • Questions & Answers
  • Register your Project
  • Test completed
  • Test failed
  • The IHIP association
  • The IHIP initiative
  • Une section de page d’accueil
  • What is IHIP about?
  • Which problem is IHIP addressing?

Categories

  • Non classé

Archive

  • March 2024
  • July 2023
  • June 2023
  • February 2023
  • October 2022
  • September 2022
  • June 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • November 2021
  • October 2021
  • September 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • October 2020
  • August 2018

CONTACT US

Email
contact@ihip.earth

Contact form

DOWNLOADS

Harmonized Conditions Of Particular Application for Humanitarian Construction Works

Harmonized Conditions Of Particular Application for Shelter Construction Works

Harmonized particular conditions of contract for construction for the WASH sector

STAY IN TOUCH WITH US

Register to our newsletter

© Copyright - International Humanitarian Infrastructure Platform
  • LinkedIn
  • The IHIP initiative
  • Privacy policy
  • Contact form
  • Register to our newsletter
Scroll to top